Things are going very smooth so far. This week R&H will be removing all of the asbestos tiles from both floors, expanding door openings, electrical , HVAC prep and tear out half of the side walks.
Welcome! This is a site dedicated to the Evangel Campus remodel that will take place most of the summer (13 weeks). In this phase, office space will be built out to allow the entire Imago Dei staff to office in one location. The move-in was scheduled for September 1st but due to a production issue on the doors was rescheduled for the 15th. (see below link called "What is Evangel Build?" for more info)
Our GREEN Building
We're using recycled office partition systems.
Old HVAC was replaced with gas pump efficiency units.
Occupancy censors for fans and lights to conserve energy.
Low-flow aerators for sinks.
Dual-Flush toilets for adults and kids to conserve water.
Bamboo fronts on the cabinets.
Cabinets have no added formaldehyde materials, with agriculture fiber wainscots.
Paint has low Volatile Organic Compounds (VOC).
Carpet tile allows for easy replacement.
All flourescent light fixtrues are replaced with high efficiency fixtures.